Difference: Atf2LwLogBook20121105EntryToDo ( vs. 1)

Revision 105 Nov 2012 - LaurieNevay

Line: 1 to 1
Added:
>
>
META TOPICPARENT name="Atf2LwLogBook"

2012 11 05 Entry List for Jan 2013

Before To Do

  • make Shark Hartman trigger cable (mini D-Sub)
  • order telescope replacement lenses
  • fix energy meter head
  • practice NI breakout box
  • practice NI digitisation of power meter
  • practice NI dummy pulses for flash lamps

Arrival Checklist

  • Camac working
  • Main lw db working
  • Signal generator / frequency correct
  • Laser locking
  • Laser output energy
  • Laser M2
  • Each computer up and running
  • Chamber homed
  • All actuators on
  • All actuators homed

To Do

  • New dummy pulses for flash lamps 3Hz -> 6Hz using NI breakout
  • Laser energy measurement
  • Signal attenuator
  • Laser photodiode measurement
  • Laser telescope replacement / alignment
  • Full laser alignment downstairs
  • Delayed HW trigger for variable delay trigger PV

To Consider

<--

Settings just to customise this page

-->
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2021 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding RHUL Physics Department TWiki? Send feedback