Difference: Atf2LwToDo (1 vs. 11)

Revision 1113 Jan 2013 - LaurieNevay

Line: 1 to 1
 
META TOPICPARENT name="Atf2Laserwire"

To do list

2013 01 09 Hardware

Changed:
<
<
  • Home all actuators
>
>
  • Home all actuators
 
  • HW epics trigger for lw data sync
  • align laser upstairs & downstairs
  • install new telescope lenses
Line: 13 to 13
 
  • detector linearity / calibration?
  • align post IP
  • Check chamber, manipulator, post ip stage, mirror actuators, lens, all laser mirrors, adc pedestal, detector background (without beam), temperature monitor
Changed:
<
<
  • install 2nd NI DAQ card / breakout panel
>
>
  • install 2nd NI DAQ card / breakout panel
 

2013 01 09 Software

  • cplusplus overlap integral
  • cplusplus fitting
Changed:
<
<
  • check 3Hz operation
  • make lw data sync epics db / pv
>
>
  • check 3Hz operation
 
  • hv power supply for detector
  • laser shutter?
  • variable attenuator
Line: 33 to 32
 
  • alignment fits
  • alignment file type / extension
  • nearest log feature
Changed:
<
<
  • finish lwAna class revamp
>
>
  • finish lwAna class revamp
  • change callbacks for movers to printout on one terminal line
  • rewrite STD function to only operate on axis #1 -> faster
 

2012 03 03 Incoming Todo

Revision 1009 Jan 2013 - LaurieNevay

Line: 1 to 1
 
META TOPICPARENT name="Atf2Laserwire"

To do list

Added:
>
>

2013 01 09 Hardware

  • Home all actuators
  • HW epics trigger for lw data sync
  • align laser upstairs & downstairs
  • install new telescope lenses
  • measure M2
  • laser energy measurement!!!!
  • laser photodiode measurement / linearity
  • detector linearity / calibration?
  • align post IP
  • Check chamber, manipulator, post ip stage, mirror actuators, lens, all laser mirrors, adc pedestal, detector background (without beam), temperature monitor
  • install 2nd NI DAQ card / breakout panel

2013 01 09 Software

  • cplusplus overlap integral
  • cplusplus fitting
  • check 3Hz operation
  • make lw data sync epics db / pv
  • hv power supply for detector
  • laser shutter?
  • variable attenuator
  • make extlw on svn - run at least
  • link run to version directory (will python, cpp follow?)
  • run, data, daq svn?

python stuff

  • anomalous orbit filter
  • alignment fits
  • alignment file type / extension
  • nearest log feature
  • finish lwAna class revamp
 
Deleted:
<
<

2011 10 22

 
Changed:
<
<
  • Motorise telescope
>
>

2012 03 03 Incoming Todo

 
Added:
>
>
  • Restart all compupters and start ioc / epics
  • Check detector insides
  • Repair post ip stage
  • Home everything
  • Check laser
  • Install and check updates python scripts
 
Changed:
<
<

2011 10 22 Leaving

>
>

2011 12 05 Software Tasks

 
Changed:
<
<
  • Controllable relay for laser shutter
  • 3 ground glass targets
>
>
  • Fix EDM
  • Fix Fitting
  • Compile FLT control & run
  • Fix LabView on extlw-win5
  • Try energy meter over USB
  • Try TD2:1:write - read doesn't work
 
Added:
>
>
File Checked / Updated Tested
ExtLwProfess Y Y
lwData Y Y
lwAcq Y Y
<noautolinklwLog Y Y
IpMoverControl Y Y
IpMoverScan Y Y
PhaseControl Y Y
PhaseScan Y Y
lwAna Y Y
lwFit N N
 

2011 11 24

Line: 39 to 91
 
  • Epics Scope
  • Check each stage mover
Changed:
<
<

20111205 Software Tasks

  • Fix EDM
  • Fix Fitting
  • Compile FLT control & run
  • Fix LabView on extlw-win5
  • Try energy meter over USB
  • Try TD2:1:write - read doesn't work

File Checked / Updated Tested
ExtLwProfess Y Y
lwData Y Y
lwAcq Y Y
<noautolinklwLog Y Y
IpMoverControl Y Y
IpMoverScan Y Y
PhaseControl Y Y
PhaseScan Y Y
lwAna Y Y
lwFit N N
>
>

2011 10 22

 
Changed:
<
<

20120303 Incoming Todo

>
>
  • Motorise telescope
 
Deleted:
<
<
  • Restart all compupters and start ioc / epics
  • Check detector insides
  • Repair post ip stage
  • Home everything
  • Check laser
  • Install and check updates python scripts
 
Changed:
<
<

PVs To Create

>
>

2011 10 22 Leaving

 
Added:
>
>
  • Controllable relay for laser shutter
  • 3 ground glass targets
 
Deleted:
<
<

PVs To Check

 

Revision 903 Apr 2012 - LaurieNevay

Line: 1 to 1
 
META TOPICPARENT name="Atf2Laserwire"

To do list

Line: 60 to 60
 
lwAna Y Y
lwFit N N
Changed:
<
<

DAQ Software Specifically

>
>

20120303 Incoming Todo

 
Changed:
<
<
Consider data writing method. Currently it needs to know all types of tokens. Make generic one that can deal with any specific token. For example

  • token1> value value value value
  • token2> value value
  • token1> etc

This will be the same format as the current data files, but will be written by a more generic method. This was the Data class will do the writing and doesn't need to know what it's writing. When reading it will create a object within the instance with the data for that token - whatever it is. I.e.

  • a = lwData.Data()
  • a.Read('filename.dat')
  • a.token1, a.token2 returns full array of these

The acquisition class will decided what the tokens should be and what to store.

For now, the Data class has the details of which PVs to store and the tokens to use them - this is because the Data write / read isn't fully developed and for now the whole data structure is in one place and not in several files (!!!).

>
>
  • Restart all compupters and start ioc / epics
  • Check detector insides
  • Repair post ip stage
  • Home everything
  • Check laser
  • Install and check updates python scripts
 

PVs To Create

Revision 810 Dec 2011 - LaurieNevay

Line: 1 to 1
 
META TOPICPARENT name="Atf2Laserwire"

To do list

Line: 45 to 45
 
  • Fix Fitting
  • Compile FLT control & run
  • Fix LabView on extlw-win5
Changed:
<
<
  • Try energy meter over USB
  • Try TD2:1:write - read doesn't work
>
>
  • Try energy meter over USB
  • Try TD2:1:write - read doesn't work
 
File Checked / Updated Tested
ExtLwProfess Y Y
Line: 80 to 80
 

PVs To Create

Changed:
<
<
extlw:edm:otrm1x extlw:edm:otrm1y extlw:edm:otrlensz extlw:edm:tel extlw:edm:otrswitchpos
>
>
 

PVs To Check

Revision 710 Dec 2011 - LaurieNevay

Line: 1 to 1
 
META TOPICPARENT name="Atf2Laserwire"

To do list

Line: 84 to 84
 extlw:edm:otrm1y extlw:edm:otrlensz extlw:edm:tel
Added:
>
>
extlw:edm:otrswitchpos
 

PVs To Check

Revision 608 Dec 2011 - LaurieNevay

Line: 1 to 1
 
META TOPICPARENT name="Atf2Laserwire"

To do list

Line: 78 to 78
  For now, the Data class has the details of which PVs to store and the tokens to use them - this is because the Data write / read isn't fully developed and for now the whole data structure is in one place and not in several files (!!!).
Added:
>
>

PVs To Create

extlw:edm:otrm1x extlw:edm:otrm1y extlw:edm:otrlensz extlw:edm:tel

PVs To Check

 

Revision 507 Dec 2011 - LaurieNevay

Line: 1 to 1
 
META TOPICPARENT name="Atf2Laserwire"

To do list

Line: 41 to 41
 

20111205 Software Tasks

Changed:
<
<
  • Fix EDM
>
>
  • Fix EDM
 
  • Fix Fitting
Changed:
<
<
  • Compile FLT control & run
>
>
  • Compile FLT control & run
 
  • Fix LabView on extlw-win5
  • Try energy meter over USB
  • Try TD2:1:write - read doesn't work
Line: 57 to 57
 
IpMoverScan Y Y
PhaseControl Y Y
PhaseScan Y Y
Changed:
<
<
lwAna N N
>
>
lwAna Y Y
 
lwFit N N

DAQ Software Specifically

Revision 405 Dec 2011 - LaurieNevay

Line: 1 to 1
 
META TOPICPARENT name="Atf2Laserwire"

To do list

2011 10 22

Changed:
<
<
  • Motorise telescope
>
>
  • Motorise telescope
 

2011 10 22 Leaving

Line: 18 to 18
 

Hardward Tasks

Changed:
<
<
  • Install software on new computers
  • Physically install and connect new computers
>
>
  • Install software on new computers
  • Physically install and connect new computers
 
  • Install energy meter
Changed:
<
<
  • Laser alignment including telescope
  • Motorise telescope
  • Post LWIP alignment
  • OTR camera installation and alignment
>
>
  • Laser alignment including telescope
  • Motorise telescope
  • Post LWIP alignment
  • OTR camera installation and alignment
 
  • Install controllable relay for shutter

Software Tasks

Line: 34 to 34
 
  • Operation state machine
  • Limit switch and home of baldor (White compatible)
  • PV Archiver
Changed:
<
<
  • Build executable VIs
>
>
  • Build executable VIs
 
  • OTR readout
  • Epics Scope
Changed:
<
<
  • Check each stage mover
>
>
  • Check each stage mover

20111205 Software Tasks

  • Fix EDM
  • Fix Fitting
  • Compile FLT control & run
  • Fix LabView on extlw-win5
  • Try energy meter over USB
  • Try TD2:1:write - read doesn't work

File Checked / Updated Tested
ExtLwProfess Y Y
lwData Y Y
lwAcq Y Y
<noautolinklwLog Y Y
IpMoverControl Y Y
IpMoverScan Y Y
PhaseControl Y Y
PhaseScan Y Y
lwAna N N
lwFit N N

DAQ Software Specifically

Consider data writing method. Currently it needs to know all types of tokens. Make generic one that can deal with any specific token. For example

  • token1> value value value value
  • token2> value value
  • token1> etc

This will be the same format as the current data files, but will be written by a more generic method. This was the Data class will do the writing and doesn't need to know what it's writing. When reading it will create a object within the instance with the data for that token - whatever it is. I.e.

  • a = lwData.Data()
  • a.Read('filename.dat')
  • a.token1, a.token2 returns full array of these

The acquisition class will decided what the tokens should be and what to store.

For now, the Data class has the details of which PVs to store and the tokens to use them - this is because the Data write / read isn't fully developed and for now the whole data structure is in one place and not in several files (!!!).

 

Revision 324 Nov 2011 - LaurieNevay

Line: 1 to 1
 
META TOPICPARENT name="Atf2Laserwire"

To do list

Line: 12 to 12
 
  • Controllable relay for laser shutter
  • 3 ground glass targets
Added:
>
>

2011 11 24

Hardward Tasks

  • Install software on new computers
  • Physically install and connect new computers
  • Install energy meter
  • Laser alignment including telescope
  • Motorise telescope
  • Post LWIP alignment
  • OTR camera installation and alignment
  • Install controllable relay for shutter

Software Tasks

 
  • Flight Simulator beam sizes etc.
  • Integrate zygo
  • Operation state machine
  • Limit switch and home of baldor (White compatible)
Added:
>
>
  • PV Archiver
  • Build executable VIs
  • OTR readout
  • Epics Scope
  • Check each stage mover
 

Revision 222 Oct 2011 - LaurieNevay

Line: 1 to 1
 
META TOPICPARENT name="Atf2Laserwire"

To do list

Changed:
<
<

Computing

>
>

2011 10 22

 
Changed:
<
<
  • Fix firefox on local computers
  • extlw-ccnet nfs mount
  • windows export
>
>
  • Motorise telescope
 
Deleted:
<
<

Optics model

  • Start zemax model of transport system

Electron beam model

  • Sigma matrix and R matrix from fs

System installation

 
Added:
>
>

2011 10 22 Leaving

 
Added:
>
>
  • Controllable relay for laser shutter
  • 3 ground glass targets
  • Flight Simulator beam sizes etc.
  • Integrate zygo
  • Operation state machine
  • Limit switch and home of baldor (White compatible)
 

Revision 110 Apr 2010 - StewartBoogert

Line: 1 to 1
Added:
>
>
META TOPICPARENT name="Atf2Laserwire"

To do list

Computing

  • Fix firefox on local computers
  • extlw-ccnet nfs mount
  • windows export

Optics model

  • Start zemax model of transport system

Electron beam model

  • Sigma matrix and R matrix from fs

System installation

<--

Settings just to customise this page

-->
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2021 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding RHUL Physics Department TWiki? Send feedback