Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
| ||||||||
Line: 24 to 24 | ||||||||
-- Varify the beam pipe heigh of cavity, if much offset then make and submit drawing for another holding plates. -- Find the electronics and digitiser card for it.(ask stewart) | ||||||||
Deleted: | ||||||||
< < | ||||||||
-- Get vacuum pipe and bellows for it. | ||||||||
Added: | ||||||||
> > | Temperature change study. -- Start publishing values of phasdiff for individual bpm and cbpm array -- From where to get a current power supply and heating tape. |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Added: | ||||||||
> > |
|