Difference: AtfBpmNewLogBook_20120409 (5 vs. 6)

Revision 610 Apr 2012 - StewartBoogert

Line: 1 to 1
 
META TOPICPARENT name="AtfBpmNewLogBook"
Line: 12 to 12
 
  • Fixed S-band reference negative sign in tune script
  • Calibration for MFB2FF (now laserwire)
  • Race condition on lsis8 (qd4aff, qf3ff, qd2bff, qd2aff)
Added:
>
>
  • Fixed by added cables to clocks on lsis8 and lsis10. This messed up FB2FF, so needs recalibration (6:30am)
 
  • Tune IP references
  • Online resolution script in normal startup
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2022 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding RHUL Physics Department TWiki? Send feedback