Difference: ClicBpm (29 vs. 30)

Revision 3029 Aug 2012 - FrancisCullinan

Line: 1 to 1
 
META TOPICPARENT name="BeamPosition"
Changed:
<
<

CLIC BPM

>
>

15 GHz Prototype Cavity

 
Changed:
<
<

Talks and meeting calendar

Drawings and diagrams

Electronics

ClicBpmElectronics

>
>

Mechanical Design

 
Changed:
<
<

Mechanical drawings

>
>
 
Changed:
<
<

First 15 GHz prototype cavity

>
>

Drawings and models:

 
Added:
>
>
 
Line: 35 to 23
 
Changed:
<
<

CAD Models

>
>

Coupler Spacing

 
Changed:
<
<
Below are the CAD 3D models of the BPM and mover system in .stp or .ipt formats. The mover system is based on a Newport UTS50PP horizontal stage and a UZS80PP vertical stage.
>
>
 
Changed:
<
<

Measurements

>
>

RF Characteristics

 
Deleted:
<
<
 
Deleted:
<
<
 
Changed:
<
<

Simulation

>
>

Mover System

Below are the CAD 3D models of the BPM and mover system in .stp or .ipt formats. The mover system is based on a Newport UTS50PP horizontal stage and a UZS80PP vertical stage.

 
Changed:
<
<
>
>

Electronics

 

Signal Processing

Changed:
<
<

Notes

>
>

Installation

 
Changed:
<
<
>
>

Talks and meeting calendar

 
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2022 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding RHUL Physics Department TWiki? Send feedback