Line: 28 to 28 | ||||||||
---|---|---|---|---|---|---|---|---|
Produced a wiring diagram for the downconverter ready for assembly. | ||||||||
Changed: | ||||||||
< < | Wiring Diagram![]() | |||||||
> > | Wiring Diagram![]() | |||||||
Also started some simple simulations of the position cavity with GdfidL. |
Line: 28 to 28 | ||||||||
---|---|---|---|---|---|---|---|---|
Produced a wiring diagram for the downconverter ready for assembly. | ||||||||
Changed: | ||||||||
< < | Wiring Diagram![]() | |||||||
> > | Wiring Diagram![]() | |||||||
Also started some simple simulations of the position cavity with GdfidL. |
Line: 28 to 28 | ||||||||
---|---|---|---|---|---|---|---|---|
Produced a wiring diagram for the downconverter ready for assembly. | ||||||||
Changed: | ||||||||
< < | Wiring Diagram![]() | |||||||
> > | Wiring Diagram![]() | |||||||
Also started some simple simulations of the position cavity with GdfidL. |
Line: 28 to 28 | ||||||||
---|---|---|---|---|---|---|---|---|
Produced a wiring diagram for the downconverter ready for assembly. | ||||||||
Changed: | ||||||||
< < | Wiring Diagram![]() | |||||||
> > | Wiring Diagram![]() | |||||||
Also started some simple simulations of the position cavity with GdfidL. |
Line: 28 to 28 | ||||||||
---|---|---|---|---|---|---|---|---|
Produced a wiring diagram for the downconverter ready for assembly. | ||||||||
Changed: | ||||||||
< < | Wiring Diagram![]() | |||||||
> > | Wiring Diagram![]() | |||||||
Also started some simple simulations of the position cavity with GdfidL. |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Monday 1st - Friday 19th October | ||||||||
Line: 17 to 17 | ||||||||
Tested electronics with Frankie (took traces of attenuators and amp and measured IP3 point of amp): | ||||||||
Changed: | ||||||||
< < | Electronics tests | |||||||
> > | Electronics tests | |||||||
Performed small simulation with wfProc
|
Line: 28 to 28 | ||||||||
---|---|---|---|---|---|---|---|---|
Produced a wiring diagram for the downconverter ready for assembly. | ||||||||
Changed: | ||||||||
< < | Wiring Diagram![]() | |||||||
> > | Wiring Diagram![]() | |||||||
Also started some simple simulations of the position cavity with GdfidL. |
Line: 1 to 1 | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Monday 1st - Friday 19th October | |||||||||||
Line: 52 to 52 | |||||||||||
![]() | |||||||||||
Added: | |||||||||||
> > | Monday 12th - Friday 23rd NovemberTested the 3 different RF diode detectors and analysed their suitability for the pickup signals.Report | ||||||||||
| |||||||||||
Added: | |||||||||||
> > |
|
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Monday 1st - Friday 19th October | ||||||||
Line: 30 to 30 | ||||||||
Wiring Diagram![]() | ||||||||
Changed: | ||||||||
< < | Also started some simple simulations of the position cavity with GdfidL | |||||||
> > | Also started some simple simulations of the position cavity with GdfidL. | |||||||
| ||||||||
Line: 40 to 40 | ||||||||
| ||||||||
Changed: | ||||||||
< < | ---++++++ Ran my own script to see expected signals of the position cavity using measured values from previous work and R/Q from GdfidL simulations. | |||||||
> > | ![]() ![]() | |||||||
Changed: | ||||||||
< < | ![]() | |||||||
> > |
| |||||||
Changed: | ||||||||
< < | ![]() | |||||||
> > | Ran my own script making use of wfproc to see expected signals of the position cavity using measured values from previous work and R/Q from GdfidL simulations.![]() ![]() | |||||||
| ||||||||
Added: | ||||||||
> > |
|
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Monday 1st - Friday 19th October | ||||||||
Line: 40 to 40 | ||||||||
| ||||||||
Added: | ||||||||
> > | ---++++++ Ran my own script to see expected signals of the position cavity using measured values from previous work and R/Q from GdfidL simulations. | |||||||
Added: | ||||||||
> > | ![]() ![]() | |||||||
| ||||||||
Added: | ||||||||
> > |
|
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
| ||||||||
Changed: | ||||||||
< < | Monday 1st - Monday 15th October | |||||||
> > | Monday 1st - Friday 19th October | |||||||
Read papers/presentations: | ||||||||
Line: 24 to 24 | ||||||||
| ||||||||
Added: | ||||||||
> > | Monday 22nd Oct - Friday 26th OctoberProduced a wiring diagram for the downconverter ready for assembly.Wiring Diagram![]() Also started some simple simulations of the position cavity with GdfidL
| |||||||
|
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
| ||||||||
Changed: | ||||||||
< < | Monday 1st - Friday 12th October | |||||||
> > | Monday 1st - Monday 15th October | |||||||
Read papers/presentations: | ||||||||
Line: 10 to 10 | ||||||||
Cavity BPM for Linear Collider Powerpoint![]() | ||||||||
Changed: | ||||||||
< < | Cavity BPM for ILC enery spectrometer![]() | |||||||
> > | Cavity BPM for ILC energy spectrometer![]() ![]() | |||||||
Tested electronics with Frankie (took traces of attenuators and amp and measured IP3 point of amp):Electronics tests Performed small simulation with wfProc | ||||||||
Added: | ||||||||
> > | ![]()
|
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Added: | ||||||||
> > |
Monday 1st - Friday 12th OctoberRead papers/presentations:IPAC 2012 CLIC BPM![]() ![]() ![]() ![]() Tested electronics with Frankie (took traces of attenuators and amp and measured IP3 point of amp):Electronics tests Performed small simulation with wfProc |