Difference: PH4100MajorProjectPTD (10 vs. 11)

Revision 1119 Mar 2009 - PedroTD

Line: 1 to 1
 
META TOPICPARENT name="PedroTD"

PH4100 Major Project

Line: 46 to 46
 20k Jan 8 2007 fastsim_ZZ_r8352_ntp.root
Changed:
<
<
Additional background samples can be found in linappserv1:/scratch2/ptd/ATLAS/MCsamples/2009/ATLFAST/
>
>
Additional background samples (generated Mar 2009) can be found in
linappserv1:/scratch2/ptd/ATLAS/MCsamples/2009/ATLFAST/
 
Changed:
<
<
tt / total 100k 20k Mar 11 2009 fastsim_tt_r8058_ntp.root 20k Mar 11 2009 fastsim_tt_r8060_ntp.root 20k Mar 11 2009 fastsim_tt_r8062_ntp.root 20k Mar 11 2009 fastsim_tt_r8064_ntp.root 20k Mar 11 2009 fastsim_tt_r8066_ntp.root
>
>
tt / total 660k fastsim_tt_rNNNN_ntp.root where NNNN (the run no.) is one of the following: 8051, 8053, 8055, 8057--8086 (33 runs in total). Each run has 20k events.
  WW / total 60k 20k Mar 11 2009 fastsim_WW_r8156_ntp.root
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2021 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding RHUL Physics Department TWiki? Send feedback