Difference: MWardWorkDiary2017W4 (3 vs. 4)

Revision 424 Jan 2017 - MarkWard

Line: 1 to 1
 
META TOPICPARENT name="MarkWard"
-- MarkWard - 23 Jan 2017
Line: 19 to 19
 
  • Floor load testing still to be determined
    • Hole in the floor has been filled with what looks like concrete
    • Items from the hallway have been moved into the lab, couple of crates and boxes plus tables... I suspect these are not perminent features, and were moved for the open day tour. Will confirm with Andy.
Added:
>
>
    • Andy Reports 24/01/2017 that there is still no full report to the department from the structural engineers, but, the company has been contracted to do the required work on the floor sometime next week... ? Plating? coating? Unknown ?!?
 
  • Items to Sam at Cryovac;
    • Requested information regarding burst disk part numbers so i can look at tollerances (how Close to 5 bar can we go)
      • Need to figure what type of disk it will be could be a -10% to 0% range, meaning the max we can safely go could be 4.5bar, but equally it could be a range -3 to +6% (depends on design) meaning 4.85 bar...
 