Difference: PaulHallamMsciProject (4 vs. 5)

Revision 501 Nov 2013 - PaulHallam

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
-- PaulHallam - 18 Oct 2013

Aims

Line: 13 to 13
 
  • Delta Cephei - Variable Star (Cephid Variable), magnitude variation 3.5 - 4.4, period 5.4 day, Good Visibility
  • Beta Persei - Variable Star (Algol Variable), magnitude variation 2.1 - 3.4, period 2.9 day, Good Visibility
  • Eta Aquila - Variable Star (Cephid Variable), magnitude variation 3.5 - 4.4, period 7.2 day, Poor Visibility
Changed:
<
<
  • RR Lyrae - Variable Star (RR Lyrae VAriable) magnitude variation 7.06 - 8.12, period 0.6 day, Good Visibilty
>
>
  • RR Lyrae - Variable Star (RR Lyrae Variable) magnitude variation 7.06 - 8.12, period 0.6 day, Good Visibilty
 

Data and Logs

18/10/13 Dark Frames: Dark Study

Line: 21 to 21
 23/10/13 FIrst Observation: Observation_RC_PH_CH

25/10/13 Dark Frames: Dark Study

Added:
>
>
1/10/13 Cooler Study: Cooler Study

Major Project Meetings

24/10/13 Project Meeting Minutes

 

Useful Information

\ No newline at end of file
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2020 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding RHUL Physics Department TWiki? Send feedback