Tags:
create new tag
view all tags

Shift plan

  • Save set file
  • Beam off pedestal ADC measurement (background and ATF ICT/BPM)
  • Measure optics: dispersion, emittance using OTR, damping ring tunes
  • Response matrix for a few correctors (don't forget to switch off ATF2 feedbacks)
  • Charge scan to check detector linearity for different HV
  • Insert each OTR screen, YAG screen
  • Collimator scan & reference cavity scan
  • Vary quadrupoles (really an orbit change)
  • Quadrupole positions
  • Measure PIC traces for some configurations
  • Restore set file, switch on ATF2 feedback, restore position of cavity bpm and collimator

Doug is planning an access, we could move the detectors a bit.

Edit | Attach | Watch | Print version | History: r6 < r5 < r4 < r3 < r2 | Backlinks | Raw View | Raw edit | More topic actions

Physics WebpagesRHUL WebpagesCampus Connect • Royal Holloway, University of London, Egham, Surrey TW20 0EX; Tel/Fax +44 (0)1784 434455/437520

Topic revision: r6 - 15 Feb 2016 - LaurieNevay

 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2025 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding RHUL Physics Department TWiki? Send feedback