Tags:
create new tag
view all tags

20120414 Background Study

Large fluctuation in signal levels versus previous setups. Investigating.

Detector On? Detector Connected? Beam Log File Figure
No Yes No 20120414_1800_log.dat 1
Yes Yes No 20120414_1800_log.dat 2
Yes Yes Yes 20120417_1145_log.dat 3

Edit | Attach | Watch | Print version | History: r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions

Physics WebpagesRHUL WebpagesCampus Connect • Royal Holloway, University of London, Egham, Surrey TW20 0EX; Tel/Fax +44 (0)1784 434455/437520

Topic revision: r2 - 17 Apr 2012 - LaurieNevay

 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2023 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding RHUL Physics Department TWiki? Send feedback