To do list
2011 10 22
2011 10 22 Leaving
- Controllable relay for laser shutter
- 3 ground glass targets
2011 11 24
Hardward Tasks
-
Install software on new computers
-
Physically install and connect new computers
- Install energy meter
-
Laser alignment including telescope
-
Motorise telescope
-
Post LWIP alignment
-
OTR camera installation and alignment
- Install controllable relay for shutter
Software Tasks
- Flight Simulator beam sizes etc.
- Integrate zygo
- Operation state machine
- Limit switch and home of baldor (White compatible)
- PV Archiver
-
Build executable VIs
- OTR readout
- Epics Scope
-
Check each stage mover
20111205 Software Tasks
-
Fix EDM
- Fix Fitting
-
Compile FLT control & run
- Fix LabView on extlw-win5
-
Try energy meter over USB
-
Try TD2:1:write - read doesn't work
File |
Checked / Updated |
Tested |
lwFit |
N |
N |
ExtLwProfess |
Y |
Y |
lwData |
Y |
Y |
lwAcq |
Y |
Y |
<noautolinklwLog |
Y |
Y |
IpMoverControl |
Y |
Y |
IpMoverScan |
Y |
Y |
PhaseControl |
Y |
Y |
PhaseScan |
Y |
Y |
lwAna |
Y |
Y |
20120303 Incoming Todo
- Restart all compupters and start ioc / epics
- Check detector insides
- Repair post ip stage
- Home everything
- Check laser
- Install and check updates python scripts
PVs To Create
PVs To Check