Check chamber, manipulator, post ip stage, mirror actuators, lens, all laser mirrors, adc pedestal, detector background (without beam), temperature monitor
install 2nd NI DAQ card / breakout panel
2013 01 09 Software
cplusplus overlap integral
cplusplus fitting
check 3Hz operation
make lw data sync epics db / pv
hv power supply for detector
laser shutter?
variable attenuator
make extlw on svn - run at least
link run to version directory (will python, cpp follow?)