To do list

2013 01 09 Hardware

  • Home all actuators
  • HW epics trigger for lw data sync
  • align laser upstairs & downstairs
  • install new telescope lenses
  • measure M2
  • laser energy measurement!!!!
  • laser photodiode measurement / linearity
  • detector linearity / calibration?
  • align post IP
  • Check chamber, manipulator, post ip stage, mirror actuators, lens, all laser mirrors, adc pedestal, detector background (without beam), temperature monitor
  • install 2nd NI DAQ card / breakout panel

2013 01 09 Software

  • cplusplus overlap integral
  • cplusplus fitting
  • check 3Hz operation
  • make lw data sync epics db / pv
  • hv power supply for detector
  • laser shutter?
  • variable attenuator
  • make extlw on svn - run at least
  • link run to version directory (will python, cpp follow?)
  • run, data, daq svn?

python stuff

  • anomalous orbit filter
  • alignment fits
  • alignment file type / extension
  • nearest log feature
  • finish lwAna class revamp

2012 03 03 Incoming Todo

  • Restart all compupters and start ioc / epics
  • Check detector insides
  • Repair post ip stage
  • Home everything
  • Check laser
  • Install and check updates python scripts

2011 12 05 Software Tasks

  • Fix EDM
  • Fix Fitting
  • Compile FLT control & run
  • Fix LabView on extlw-win5
  • Try energy meter over USB
  • Try TD2:1:write - read doesn't work

File Checked / Updated Tested
ExtLwProfess Y Y
lwData Y Y
lwAcq Y Y
<noautolinklwLog Y Y
IpMoverControl Y Y
IpMoverScan Y Y
PhaseControl Y Y
PhaseScan Y Y
lwAna Y Y
lwFit N N

2011 11 24

Hardward Tasks

  • Install software on new computers
  • Physically install and connect new computers
  • Install energy meter
  • Laser alignment including telescope
  • Motorise telescope
  • Post LWIP alignment
  • OTR camera installation and alignment
  • Install controllable relay for shutter

Software Tasks

  • Flight Simulator beam sizes etc.
  • Integrate zygo
  • Operation state machine
  • Limit switch and home of baldor (White compatible)
  • PV Archiver
  • Build executable VIs
  • OTR readout
  • Epics Scope
  • Check each stage mover

2011 10 22

  • Motorise telescope

2011 10 22 Leaving

  • Controllable relay for laser shutter
  • 3 ground glass targets

Edit | Attach | Watch | Print version | History: r11 < r10 < r9 < r8 < r7 | Backlinks | Raw View | Raw edit | More topic actions...

Physics WebpagesRHUL WebpagesCampus Connect • Royal Holloway, University of London, Egham, Surrey TW20 0EX; Tel/Fax +44 (0)1784 434455/437520

Topic revision: r10 - 09 Jan 2013 - LaurieNevay

 
  • Edit
  • Attach
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2023 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding RHUL Physics Department TWiki? Send feedback