To do list

2011 10 22

  • Motorise telescope

2011 10 22 Leaving

  • Controllable relay for laser shutter
  • 3 ground glass targets
  • Flight Simulator beam sizes etc.
  • Integrate zygo
  • Operation state machine
  • Limit switch and home of baldor (White compatible)

Edit | Attach | Watch | Print version | History: r11 | r4 < r3 < r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions...

Physics WebpagesRHUL WebpagesCampus Connect • Royal Holloway, University of London, Egham, Surrey TW20 0EX; Tel/Fax +44 (0)1784 434455/437520

Topic revision: r2 - 22 Oct 2011 - LaurieNevay

 
  • Edit
  • Attach
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2022 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding RHUL Physics Department TWiki? Send feedback