To do list

2011 10 22

  • Motorise telescope

2011 10 22 Leaving

  • Controllable relay for laser shutter
  • 3 ground glass targets

2011 11 24

Hardward Tasks

  • Install software on new computers
  • Physically install and connect new computers
  • Install energy meter
  • Laser alignment including telescope
  • Motorise telescope
  • Post LWIP alignment
  • OTR camera installation and alignment
  • Install controllable relay for shutter

Software Tasks

  • Flight Simulator beam sizes etc.
  • Integrate zygo
  • Operation state machine
  • Limit switch and home of baldor (White compatible)
  • PV Archiver
  • Build executable VIs
  • OTR readout
  • Epics Scope
  • Check each stage mover

Edit | Attach | Watch | Print version | History: r11 | r5 < r4 < r3 < r2 | Backlinks | Raw View | Raw edit | More topic actions...

Physics WebpagesRHUL WebpagesCampus Connect • Royal Holloway, University of London, Egham, Surrey TW20 0EX; Tel/Fax +44 (0)1784 434455/437520

Topic revision: r3 - 24 Nov 2011 - LaurieNevay

 
  • Edit
  • Attach
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2022 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding RHUL Physics Department TWiki? Send feedback