To do list

2011 10 22

  • Motorise telescope

2011 10 22 Leaving

  • Controllable relay for laser shutter
  • 3 ground glass targets

2011 11 24

Hardward Tasks

  • Install software on new computers
  • Physically install and connect new computers
  • Install energy meter
  • Laser alignment including telescope
  • Motorise telescope
  • Post LWIP alignment
  • OTR camera installation and alignment
  • Install controllable relay for shutter

Software Tasks

  • Flight Simulator beam sizes etc.
  • Integrate zygo
  • Operation state machine
  • Limit switch and home of baldor (White compatible)
  • PV Archiver
  • Build executable VIs
  • OTR readout
  • Epics Scope
  • Check each stage mover

20111205 Software Tasks

  • Fix EDM
  • Fix Fitting
  • Compile FLT control & run
  • Fix LabView on extlw-win5
  • Try energy meter over USB
  • Try TD2:1:write - read doesn't work

File Checked / Updated Tested
ExtLwProfess Y Y
lwData Y Y
lwAcq Y Y
<noautolinklwLog Y Y
IpMoverControl Y Y
IpMoverScan Y Y
PhaseControl Y Y
PhaseScan Y Y
lwAna Y Y
lwFit N N

20120303 Incoming Todo

  • Restart all compupters and start ioc / epics
  • Check detector insides
  • Repair post ip stage
  • Home everything
  • Check laser
  • Install and check updates python scripts

PVs To Create

PVs To Check

Edit | Attach | Watch | Print version | History: r11 < r10 < r9 < r8 < r7 | Backlinks | Raw View | Raw edit | More topic actions...

Physics WebpagesRHUL WebpagesCampus Connect • Royal Holloway, University of London, Egham, Surrey TW20 0EX; Tel/Fax +44 (0)1784 434455/437520

Topic revision: r9 - 03 Apr 2012 - LaurieNevay

 
  • Edit
  • Attach
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2022 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding RHUL Physics Department TWiki? Send feedback