RHUL Physics Department TWiki
>
PP/JAI Web
>
RFLab
>
BeamPosition
>
AtfBpmDigital
>
AtfBpmNewLogBook
(14 May 2013,
YoungimKim
)
Tags:
tag this topic
create new tag
view all tags
2010/11/30 - Multibunch
2010/12/06 - Electronics stability: cal tone measurements
2010/12/07 - Jitter subtracted calibration
2010/12/08 - Modified calibration: fixed origin fit and strict intensity cuts
2010/12/09 - Calibration Log for Debugging
2010/12/09 - Multibunch data, and analysis
2010/12/09 - Multibunch analysis (New)
2010/12/09 - ATF2/BPM shift
2010/12/10 - Simulated effects of quadrupole strength on calibration
2010/12/13 - A bit more of digging up on possible connection between the t0 and phase jumps
2010/12/14 - ATF2/BPM shift
2010/12/15 - Quadrupole Strength Results
2010/12/15 - ATF2/BPM shift
2010/12/17 - Static Calibration: logs of t0 and jitter
2010/12/17 - IP BPM simulations
2010/12/XX - BPM temperature monitoring
2011/02/01 - ATF2/BPM Shift
2011/02/02 - ATF2/BPM Shift
2011/02/15 - ATF2/BPM shift
2011/02/23 - Gain measurements
2011/06/09 - Boogert improvements
2011/06/14 - New automatic displays
2011/06/15 - Signals back again (no cal tone)
2011/06/17 - Sband control, just liked this screen shot
2011/06/18 - Digitizer noise measurement
2011/06/19 - Photos and Cal tone measurements
2011/06/20 - S-band cables and S-band IPX LO
2011/06/20 - Mini shift
2011/06/21 - Mini shift
2011/06/22 - S-band cables, RF propagation
2011/06/23- Temperature monitoring
2011/06/23 - Wednesday meeting talk, analysis summary, exit todo list
2011/10/14 - To do list
2011/10/17 - Temperature array generation and archive
2011/10/17 - Archive loader
2011/10/18 - Merge SL and C BPM data
2011/10/19 - caltone stability
2011/10/19 - stripline timing tests
2011/10/20 - ATF2/BPM shift
2011/10/21 - more stripline testing
2011/10/21 - Temperature change study
2011/10/24 - Calibration tone comissioning
2011/10/24 - Strip-line BPM testing
2011/10/24 - Jitter subtraction in tuned BPMs using strip-lines
2011/10/25 - Temperature change study
2011/10/26-28 - ATF2/BPM Shift
2011/10/26 - Rearrangement of SIS system
2011/10/27 - Temperature change study
2011/10/27 - IpBpm Integration
2011/10/28 - Exit to do list
2011/10/28 - NLS BPM drawings and Installation information
2011/11/02 - Calibration statistics
2011/11/XX - S-Band DR RF problem
2011/11/08 - Shift
2011/11/14 - Shift
2011/11/17 - ToDoList for NJ
2011/11/18 - Progress on Cavity installation
2011/11/26 - Testing C-Band electronics
2011/11/27 - Testing C-Band electronics
2011/11/28 - Cavity Installation
2011/11/28 - ATF2/BPM Shift
2011/11/29 - ATF2/BPM Shift
2011/11/30 - Multi-Bunch Shift
2011/12/02 - Multi-Bunch Shift
2011/12/04 - LXI scope installation and testing.
2011/12/05 - ATF2/BPM Shift and BPM Accounting
2011/12/06 - Calibration statistics
2011/12/07 - Multi-Bunch Shift
2011/12/07 - Scope installation and Diode measurements
2011/12/07 - Multi-Bunch Evening Shift
2011/12/08 - Gaussian fits to calibration stability data
2011/12/12 - ToDoList for final week
2011/12/12 - Cable loss measurement and Diode connection change
2011/12/12 - Calibrations for start of running
2011/12/12 - Calibration statistics for FS-Bump Calibrations
2011/12/13 - System hardware changes
2011/12/13 - Multi-Bunch Shift
2011/12/14 - IP Region Waveforms and calibration
2011/12/14 - Multi-Bunch Shift
2011/12/14 - Cavity BPM Multi-Bunch Shift
2011/12/15 - S-band calibrations
2012/04/06 - Hardware/software checkout and Todo
2012/04/09 - Calibration shift
2012/04/13 - Diamond cavity
2012/06/08 - April calibration stability
2012/10/09 - Calibration tone correlations
2012/11/06 - Tune and calibration
2013/04/04 - Startup and checkout
2013/04/07 - Gain measurements for REF channels
2013/04/09 - CBPM shift - Calibration
2013/04/12 - CBPM shift - Wakefield measurements
2013/04/13 - ArchiveExport+HDF5 instructions
2013/04/14 - REFIPX
2013/04/16 - CBPM shift - Calibration
2013/04/19 - CBPM shift - Wakefield measurements
2013/04/19 - Bellows and dial gauge check
2013/04/23 - CBPM shift - Wakefield measurements
2013/04/24 - CBPM shift - Wakefield measurements + Calibration
2013/04/25 - CBPM shift - Wakefield measurements + Calibration
2013/04/26 - CBPM shift - Calibration - Magnet strength scan
2013/05/14 - ATF2 shift - Calibration - QD2BFF, QD2AFF
E
dit
|
A
ttach
|
Watch
|
P
rint version
|
H
istory
: r111
<
r110
<
r109
<
r108
<
r107
|
B
acklinks
|
R
aw View
|
Ra
w
edit
|
M
ore topic actions
Physics Webpages
•
RHUL Webpages
•
Campus Connect
• Royal Holloway, University of London, Egham, Surrey TW20 0EX; Tel/Fax +44 (0)1784 434455/437520
Topic revision: r111 - 14 May 2013
-
YoungimKim
Home
Site map
CM web
Public web
Main web
PP web
Public web
Public web
ShowCase web
Students web
PostGraduates web
UnderGraduates web
TWiki web
JAI Web
Create New Topic
Index
Search
Changes
Notifications
RSS Feed
Statistics
Preferences
P
P
P
View
Raw View
Print version
Find backlinks
History
More topic actions
Edit
Raw edit
Attach file or image
Edit topic preference settings
Set new parent
More topic actions
Account
Log In
Register User
E
dit
A
ttach
Copyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding RHUL Physics Department TWiki?
Send feedback