2010/11/30 - Multibunch
2010/12/06 - Electronics stability: cal tone measurements
2010/12/07 - Jitter subtracted calibration
2010/12/08 - Modified calibration: fixed origin fit and strict intensity cuts
2010/12/09 - Calibration Log for Debugging
2010/12/09 - Multibunch data, and analysis
2010/12/09 - Multibunch analysis (New)
2010/12/09 - ATF2/BPM shift
2010/12/10 - Simulated effects of quadrupole strength on calibration
2010/12/13 - A bit more of digging up on possible connection between the t0 and phase jumps
2010/12/14 - ATF2/BPM shift
2010/12/15 - Quadrupole Strength Results
2010/12/15 - ATF2/BPM shift
2010/12/17 - Static Calibration: logs of t0 and jitter
2010/12/17 - IP BPM simulations
2010/12/XX - BPM temperature monitoring
2011/02/01 - ATF2/BPM Shift
2011/02/02 - ATF2/BPM Shift
2011/02/15 - ATF2/BPM shift
2011/02/23 - Gain measurements
2011/06/09 - Boogert improvements
2011/06/14 - New automatic displays
2011/06/15 - Signals back again (no cal tone)
2011/06/17 - Sband control, just liked this screen shot
2011/06/18 - Digitizer noise measurement
2011/06/19 - Photos and Cal tone measurements
2011/06/20 - S-band cables and S-band IPX LO
2011/06/20 - Mini shift
2011/06/21 - Mini shift
2011/06/22 - S-band cables, RF propagation
2011/06/23- Temperature monitoring
2011/06/23 - Wednesday meeting talk, analysis summary, exit todo list
2011/10/14 - To do list
2011/10/17 - Temperature array generation and archive
2011/10/17 - Archive loader
2011/10/18 - Merge SL and C BPM data
2011/10/19 - caltone stability
2011/10/19 - stripline timing tests
2011/10/20 - ATF2/BPM shift
2011/10/21 - more stripline testing
2011/10/21 - Temperature change study
2011/10/24 - Calibration tone comissioning
2011/10/24 - Strip-line BPM testing
2011/10/24 - Jitter subtraction in tuned BPMs using strip-lines
2011/10/25 - Temperature change study
2011/10/26-28 - ATF2/BPM Shift
2011/10/26 - Rearrangement of SIS system
2011/10/27 - Temperature change study
2011/10/27 - IpBpm Integration
2011/10/28 - Exit to do list
2011/10/28 - NLS BPM drawings and Installation information
2011/11/02 - Calibration statistics
2011/11/XX - S-Band DR RF problem
2011/11/08 - Shift
2011/11/14 - Shift
2011/11/17 - ToDoList for NJ
2011/11/18 - Progress on Cavity installation
2011/11/26 - Testing C-Band electronics
2011/11/27 - Testing C-Band electronics
2011/11/28 - Cavity Installation
2011/11/28 - ATF2/BPM Shift
2011/11/29 - ATF2/BPM Shift
2011/11/30 - Multi-Bunch Shift
2011/12/02 - Multi-Bunch Shift
2011/12/04 - LXI scope installation and testing.
2011/12/05 - ATF2/BPM Shift and BPM Accounting
2011/12/06 - Calibration statistics
2011/12/07 - Multi-Bunch Shift
2011/12/07 - Scope installation and Diode measurements
2011/12/07 - Multi-Bunch Evening Shift
2011/12/08 - Gaussian fits to calibration stability data
2011/12/12 - ToDoList for final week
2011/12/12 - Cable loss measurement and Diode connection change
2011/12/12 - Calibrations for start of running
2011/12/12 - Calibration statistics for FS-Bump Calibrations
2011/12/13 - System hardware changes
2011/12/13 - Multi-Bunch Shift
2011/12/14 - IP Region Waveforms and calibration
2011/12/14 - Multi-Bunch Shift
2011/12/14 - Cavity BPM Multi-Bunch Shift
2011/12/15 - S-band calibrations
2012/04/06 - Hardware/software checkout and Todo
2012/04/09 - Calibration shift
2012/04/13 - Diamond cavity
2012/06/08 - April calibration stability
2012/10/09 - Calibration tone correlations
2012/11/06 - Tune and calibration
2013/04/04 - Startup and checkout
2013/04/07 - Gain measurements for REF channels
2013/04/09 - CBPM shift - Calibration
2013/04/12 - CBPM shift - Wakefield measurements
2013/04/13 - ArchiveExport+HDF5 instructions
2013/04/14 - REFIPX
This topic: PP/JAI
>
BeamPosition
>
AtfBpmDigital
>
AtfBpmNewLogBook
Topic revision: r103 - 15 Apr 2013 - AlexeyLyapin
Copyright © 2008-2023 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding RHUL Physics Department TWiki?
Send feedback