get schedule for font or anyother multi-bunch operation.
add frequency finding module.
Mark bpms with good resolution and clean signal.
Helpful arrays to publish * launstsaturated, amplitude.
How to change the bunch separation if you get dedicated shift.
Measure electronic bandwidth and saturation.
To do list of Diamond cavity, (Beam operation gap 21-26 )
First get the cavity out of tunnel and assemble the plate.
If problem with height, then (1) cut side plates by required height, and put two new through holes. (2) put two new tapped holes in bottom plates accordingly. This way you will not need to make new bottom plate, if the coaxial adapter has enough room.
Verify the beam pipe heigh of cavity, if much offset then make and submit drawing for another holding plates.
Find the electronics and digitiser card for it.(ask stewart)
Get vacuum pipe and bellows for it.
Temperature change study
Start publishing values of phasdiff for individual bpm and cbpm array
From where to get a current power supply and heating tape.