Tags:
create new tag
view all tags

General BPM shift plan

Start of operations

  1. Check I-Q rotation and scale with calibration tone
  2. Tune reference cavities

Weekly calibration

  1. Determine reference parameters
  2. Determine dipole parameters
  3. Mover calibration
  4. Corrector calibration

Reference parameters

Dipole parameters

Mover calibration

Corrector calibration

Physics WebpagesRHUL WebpagesCampus Connect • Royal Holloway, University of London, Egham, Surrey TW20 0EX; Tel/Fax +44 (0)1784 434455/437520

Topic revision: r2 - 12 Sep 2009 - StewartBoogert

 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2026 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding RHUL Physics Department TWiki? Send feedback