RHUL Physics Department TWiki
>
PP/JAI Web
>
RFLab
>
BeamPosition
>
ClicBpm
(12 Jan 2015,
JackTowler
)
Tags:
tag this topic
create new tag
view all tags
15 GHz Prototype Cavity
Second Generation
Mechanical Design
Design notes from first prototype
Drawings and models:
Cavity BPM Assembly
Assembly
Main body (cavity+waveguides)
Upstream body (cavity cap)
Intermediate body (reference cavity)
Downstream flange (reference cavity cap)
M10 insert (tuner insert)
Rotatable half flange (split flange)
Feedthrough gasket
Feedthrough
VATSeal gaskets booklet
Pickup with support
Support
Nut clamping feedthrough
Alignment fiducials - BPM
Alignment fiducials - OTR
Coupler
RF Measurements
Simulation of feedthrough antennas
Design of antenna with bead
RF Characteristics
Basic characteristics
Modified reference cavity measurements at CERN
Measurements of the brazed assembly
Results from cavity tuning
Estimates of Cavity Sensitivity from Simulation and Measurements
Mover System
Below are the CAD 3D models of the BPM and mover system in .stp or .ipt formats. The mover system is based on a Newport
UTS50PP
horizontal stage and a
UZS80PP
vertical stage.
Vertical stage
Horizontal stage
Adapter
Baseplate
Mover Assembly
Mover Tests
Electronics
CLIC MB BPM processing electronics
ClicBpmElectronics
CTF3 processing electronics inventory
Measurements
Full down-converter measurements
Simulation
Digitiser
Diode detector measurements
LO box picture
PSU control VI for LO Box
Signal Processing
Signal Processing Preliminary
Digitiser Effects
Average signal theory
Average signal processing
Numerical Analysis of the fundamental frequencies
Installation
CTF3 Layout and Photos
CTF3 Test Bench
Cables
Beam Tests
Spring 2013 Logbook
Spring 2014 Logbook
Califes Corrector Response
Shape of Real Signals
Talks and meeting calendar
9-11/05/2012 CLIC Collaboration Working Meeting
16-18/01/2012 DITANET BPM workshop at CERN
10/04/2011 CERN-UK Kick off meeting
30/01/2013 CLIC Workshop
07/05/2013 CLIC Experimental Verification Meeting
Slides
09/05/2012 CLIC Collaboration Meeting
06/06/2012 Electronics Internal
01/10/2012 JAI Octoberfest
18/12/2012 Internal Meeting - Installation Update, Electronic Test Results
30/01/2013 CLIC Workshop
28/02/2013 Internal Meeting - Attenuation and Corrector Scans, Frequency and Decay Measurements
14/03/2013 Internal Meeting - Charge and Pulse Scans, Diode Amp Tests
12/04/2013 Beam Request
07/05/2013 CLIC Experimental Verification Meeting
07/05/2013 Internal Meeting - Calibration Results, Drive Beam Interference, Diode Results
23/05/2013 Internal Meeting - Cavity and Preliminary Feedthrough Simulation
06/06/2013 Internal Meeting - Cavity and Feedthrough Simulation
05/07/2013 Internal Meeting - Feedthrough Simulation
E
dit
|
A
ttach
|
Watch
|
P
rint version
|
H
istory
: r63
<
r62
<
r61
<
r60
<
r59
|
B
acklinks
|
R
aw View
|
Ra
w
edit
|
M
ore topic actions
Physics Webpages
•
RHUL Webpages
•
Campus Connect
• Royal Holloway, University of London, Egham, Surrey TW20 0EX; Tel/Fax +44 (0)1784 434455/437520
Topic revision: r63 - 12 Jan 2015
-
JackTowler
Home
Site map
CM web
Public web
Main web
PP web
Public web
Public web
ShowCase web
Students web
PostGraduates web
UnderGraduates web
TWiki web
JAI Web
Create New Topic
Index
Search
Changes
Notifications
RSS Feed
Statistics
Preferences
P
P
View
Raw View
Print version
Find backlinks
History
More topic actions
Edit
Raw edit
Attach file or image
Edit topic preference settings
Set new parent
More topic actions
Account
Log In
Register User
E
dit
A
ttach
Copyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding RHUL Physics Department TWiki?
Send feedback