CLIC BPM

Talks and meeting calendar

  • 9-11/05/2012 CLIC Collaboration Working Meeting
  • 16-18/01/2012 DITANET BPM workshop at CERN
  • 10/04/2011 CERN-UK Kick off meeting

Drawings and diagrams

Electronics

ClicBpmElectronics

  • CLIC MB BPM processing electronics

Mechanical drawings

First 15 GHz prototype cavity

  • Assembly
  • Main body (cavity+waveguides)
  • Upstream body (cavity cap)
  • Intermediate body (reference cavity)
  • Downstream flange (reference cavity cap)
  • M10 insert (tuner insert)
  • Rotatable half flange (split flange)
  • Feedthrough gasket
  • Feedthrough
  • VATSeal gaskets booklet
  • Pickup with support
  • Support
  • Nut clamping feedthrough

Measurements

  • Basic characteristics
  • Coupler gap variation
  • Modified reference cavity measurements at CERN
  • Measurements of the brazed assembly
  • Results from cavity tuning

Simulation

  • Coupler gap variation
  • Electronics

Notes

  • Design notes from first prototype
  • CTF3


This topic: PP/JAI > BeamPosition > ClicBpm
Topic revision: r20 - 05 Jul 2012 - FrancisCullinan
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2022 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding RHUL Physics Department TWiki? Send feedback