Tags:
create new tag
view all tags

Metrology Results from DMP

  • Technical drawings contain the relevant number for each metrological measurement.

Position Cavity

Upstream Body

  • All pieces are to be accepted, except number 1, which will be remanufactured.

Main Body

  • All pieces are to be accepted, except number 1, which will be remanufactured.

Reference Cavity

Intermediate Body

  • All pieces are to be remanufactured, except number 4, which will be accepted.

Piece Frequency Change /MHz Q Factor Change
1 + 27 29
2 + 23 27
3 + 21 26
4 + 12 25
5 + 56 12

After remanufacturing

  • It appears all 5 pieces were remanufactured.

Edit | Attach | Watch | Print version | History: r3 < r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions

Physics WebpagesRHUL WebpagesCampus Connect • Royal Holloway, University of London, Egham, Surrey TW20 0EX; Tel/Fax +44 (0)1784 434455/437520

Topic revision: r3 - 17 Feb 2015 - JackTowler

 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2025 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding RHUL Physics Department TWiki? Send feedback