Tags:
create new tag
view all tags

PETRA-III Laser-wire

20Hz Laser Timing

see Elog entry #66

The delay between the Flashlamp (FIRE) and Q-switch (QSW) signal should be 165us.

Some work was done to confirm this timing, but it has gone missing ;-( It needs to e re-done!

Edit | Attach | Watch | Print version | History: r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions

Physics WebpagesRHUL WebpagesCampus Connect • Royal Holloway, University of London, Egham, Surrey TW20 0EX; Tel/Fax +44 (0)1784 434455/437520

Topic revision: r2 - 22 Feb 2013 - GaryBoorman

 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2025 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding RHUL Physics Department TWiki? Send feedback