Log Book Entry No.29

Days, Calendar Created: 04 Dec 2013 17:46:45 Days, Calendar Last Revised: 05 Dec 2013 13:19:38 Person PaulHallam Text Observation_PH_JD_LF

IDEA! Please edit and put your text etc. here

Telescope Set Up

  • Target Delta Cephei selected using Stellarium and AAVSO catalogs
  • Open shutters (ropes, pull apart, tie off ropes, motor control
  • Turn power on
  • Press power switch on telescope
  • Removelens caps
  • Point towards Vega
  • Line up with finer scope
  • Take continuous frames 0.1s
  • Center Vega in frame
  • Synchronise Vega with Maxim DL and Stellarium

Target Information

  • Pulsating Variable star, magnitude variation 3.5 - 4.4, Δm = 0.9
  • Period 5.4 days
  • Next maximum, 07/12/2013, 9:32
  • RA: 22h, 29min, 41s, Dec: 58deg, 29', 12"
  • From simulated light curve - expected Δm(max) = 0.26, expected Δm(min) = 0.01
  • From light curve of Delta Cephei, and time of next maximum, we believe the magnitude should be decreasing
  • Companion star HIP 110988 used as a reference star

Initial Observation of Delta Cephei

  • Centered on Delta Cephei - did not use Stellarium as could move telescope through the pole
  • Frames were taken using different filters, initial exposure times:
  • No filters - 1s
  • Blue filter - 10s
  • Green filter - 3s
  • Red filter - 3s
  • Took sample frames using this-set up, max pixel count was found using Python
  • Re-evaluate exposure time to ensure max pixel count was in the range 55000 - 60000
  • Re-evaluated exposure times:
  • Focus filter - 1.1s
  • No filter - 1s
  • Blue filter - 10s
  • Green filter - 5.1s
  • Red filter - 3.3s
  • Decided to take 5 repeats for each of these, and 10 repeats for Dark and Bias frames
  • Autosave feature was used to take a sample set of data
  • Residual image of Star found on Dark frames - low pixel count
  • Implemented a 'Trash' frame before the Dark frame to attempt to remove this -> some residual image still remained

Observation of Delta Cephei

  • Autosave feature took approximately 10 - 15 minutes to run
  • Approximately three runs were taken per hour
  • Delta Cephei was observed for 5 - 6 hours

Telescope Pack Up

  • Turn off coolers
  • Disconnect Camera
  • Disconnect Stellarium and Maxim DL
  • Put lens cap on telescope
  • Turn off camera
  • Turn off telescope
  • Put cover back on camera
  • Close dome shutters
  • Turn off PC monitors
  • Turn off lights and leave dome

Back to: LogBookAstronomy

LogBookForm
Subject Observation_PH_JD_LF
Status blank
Edit | Attach | Watch | Print version | History: r3 < r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions

Physics WebpagesRHUL WebpagesCampus Connect • Royal Holloway, University of London, Egham, Surrey TW20 0EX; Tel/Fax +44 (0)1784 434455/437520

Topic revision: r3 - 05 Dec 2013 - PaulHallam

 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2025 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding RHUL Physics Department TWiki? Send feedback