Log Book Entry No.133

Days, Calendar Created: 20 Jan 2017 15:37:14 Days, Calendar Last Revised: 20 Jan 2017 15:37:14 Person ThomasHyatt Text Spectra Calibration

IDEA!

Rose Grey, Matthew Last

14.00 start time

Used LR1 ASEQ Instruments spectrometer plus fiber optic cable

Used CheckTr program inside zip folder 'consol_001....'

Lined up end of optic cable with elemental lamps:

used Hg bulb

used He bulb

took 10 sets of each data

15.35 stop time

Back to: LogBookAstronomy

LogBookForm
Subject Spectra Calibration
Status blank
Topic attachments
I Attachment History Action Size Date Who Comment
Compressed Zip archivezip 20170120_2_MR.zip r1 manage 475.5 K 20 Jan 2017 - 15:37 ThomasHyatt  
Edit | Attach | Watch | Print version | History: r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions...

Physics WebpagesRHUL WebpagesCampus Connect • Royal Holloway, University of London, Egham, Surrey TW20 0EX; Tel/Fax +44 (0)1784 434455/437520

Topic revision: r1 - 20 Jan 2017 - ThomasHyatt

 
  • Edit
  • Attach
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2023 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding RHUL Physics Department TWiki? Send feedback