TrigMC software release coordination: PTD's logbook - page for December 2018

Notes

Use the shift date in reverse chronological order to enter any new Merge Requests.

For each shift date show the NEW MRs, and any related relevant comments/questions; note down when I (or some one else) merged/closed each request, and mark the MR as done/closed by ticking the box ( [x]). If an MR takes longer than a day to merge, leave it listed under the original shift date, but add comments prefaced with the date of the comment/action. Only MRs that are still active should have the box unticked ( [ ]).

Therefore each MR will only appear once in the log, under the date of the day when I first became aware of it.

Requests still open:

nn/m/2018

[ ] !NNNNN Title (opened by XYZ)

3/12/2018

[ ] !16412 time prints the full cmd line before real..user..sys (for branch 21.0-TrigMC) (opened by Oleg Zenin)

00.31am This MR was opened yesterday. CI pipeline failed 14 h ago due to externals, after having run for 3h30. New pipeline job was automatically started 1 hour ago by the ATLAS Robot; still running...


-- PedroTeixeiraDias - 28 Nov 2018

Edit | Attach | Watch | Print version | History: r12 | r4 < r3 < r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions...

Physics WebpagesRHUL WebpagesCampus Connect • Royal Holloway, University of London, Egham, Surrey TW20 0EX; Tel/Fax +44 (0)1784 434455/437520

Topic revision: r2 - 02 Dec 2018 - PedroTeixeiraDias

 
  • Edit
  • Attach
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2023 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding RHUL Physics Department TWiki? Send feedback